The Alexander Orr Wastewater Treatment Plant (Reservoir No. 5) project was completed for the Miami-Dade Water and Sewer Department (MDWASD) and included clearing and grubbing, excavating, dewatering, including sheet piling and trenches, and preparation of site for the construction of a reinforced concrete 20 million gallon potable water reservoir (approximately 705 FT x 265 FT), furnishing and installing four (4) sluice gates (84 in x 84 in); installation of piping and valves, miscellaneous electric work, landscaping and all other related items necessary for complete installation.