This project consist of the construction of the new entrance/exit ramp at Indiantown Road and the Florida’s Turnpike (SR91). Work includes demolition of the existing bridge and construction of one (1) new bridge. Structures include FIB 78-in prestressed concrete beams over SR91, MSE walls at each end of the bridge, temporary critical steel pile walls and temporary critical MSE Wall.