Located on one the most traveled highways in Miami, FL, the project consisted of, but was not limited to, providing all labor, maintenance of traffic schemes, materials, equipment and incidentals necessary for the bridge widening and ramp improvements at the SR 836 and N.W. 57th Avenue Interchange. The work included clearing and grubbing, embankment, Type B stabilization, lime rock base, milling and resurfacing, asphalt pavement, drainage, gravity walls, bridge widening, guardrail, detector loop assemblies, lighting, signing and pavement markings.